Evco S.r.l. • EC 6-295 P220 S101 • Sheet 1/31 PREPARATIONS1.1 How to install the instrumentOn DIN rail (it is not supplied by the builder).DIN rail in
6.2 Evaporator temperature showingIf you have to show the evaporator temperature:• gain access the additional functions• pressor for selecting • press
Evco S.r.l. • EC 6-295 P220 S101 • Sheet 2/38 ALARMS8.1 AlarmsINDICAT.Defrost LEDif it is lighted, the defrost output will be activatedif it flashes:•
cabinetprobealarmevapora-tor probealarmauxiliaryprobealarm• the kind of cabinetprobe you have con-nected is not right• the cabinet probeplays up• the
Evco S.r.l. • EC 6-295 P220 S101 • Sheet 3/3Power supply: 230 Vac, 50/60 Hz, 4 VA.Clock data maintenance without power supply: 24 hours (the instrumen
10 WORKING SETPOINT AND CONFIGURATION PARAMETERS10.1 Working setpointLABEL MIN. MAX. U.M. DEF. WORKING SETPOINTr1 r2 °C/°F (5)0.0 working setpoint10.2
Comentarios a estos manuales